Class information for: |
Basic class information |
| ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
|---|---|---|---|
| 15881 | 617 | 18.9 | 45% |
Classes in level above (level 2) |
| ID, lev. above |
Publications | Label for level above |
|---|---|---|
| 1367 | 7758 | MODEL PREDICTIVE CONTROL//JOURNAL OF PROCESS CONTROL//DATA RECONCILIATION |
Terms with highest relevance score |
| Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
|---|---|---|---|---|---|---|
| 1 | DATA RECONCILIATION | Author keyword | 68 | 47% | 17% | 107 |
| 2 | GROSS ERROR DETECTION | Author keyword | 40 | 66% | 6% | 37 |
| 3 | DYNAMIC DATA RECONCILIATION | Author keyword | 21 | 78% | 2% | 14 |
| 4 | STREAM SAMPLING | Author keyword | 11 | 78% | 1% | 7 |
| 5 | INSTRUMENTATION DESIGN | Author keyword | 9 | 64% | 1% | 9 |
| 6 | SENSOR NETWORK DESIGN | Author keyword | 7 | 43% | 2% | 13 |
| 7 | SAMPLING CORRECTNESS | Author keyword | 6 | 100% | 1% | 4 |
| 8 | INSTRUMENTATION UPGRADE | Author keyword | 4 | 75% | 0% | 3 |
| 9 | DATA RECTIFICATION | Author keyword | 4 | 44% | 1% | 7 |
| 10 | COMPLEJO CRIBABB | Address | 3 | 50% | 1% | 5 |
Web of Science journal categories |
Author Key Words |
| Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
LCSH search | Wikipedia search |
|---|---|---|---|---|---|---|---|
| 1 | DATA RECONCILIATION | 68 | 47% | 17% | 107 | Search DATA+RECONCILIATION | Search DATA+RECONCILIATION |
| 2 | GROSS ERROR DETECTION | 40 | 66% | 6% | 37 | Search GROSS+ERROR+DETECTION | Search GROSS+ERROR+DETECTION |
| 3 | DYNAMIC DATA RECONCILIATION | 21 | 78% | 2% | 14 | Search DYNAMIC+DATA+RECONCILIATION | Search DYNAMIC+DATA+RECONCILIATION |
| 4 | STREAM SAMPLING | 11 | 78% | 1% | 7 | Search STREAM+SAMPLING | Search STREAM+SAMPLING |
| 5 | INSTRUMENTATION DESIGN | 9 | 64% | 1% | 9 | Search INSTRUMENTATION+DESIGN | Search INSTRUMENTATION+DESIGN |
| 6 | SENSOR NETWORK DESIGN | 7 | 43% | 2% | 13 | Search SENSOR+NETWORK+DESIGN | Search SENSOR+NETWORK+DESIGN |
| 7 | SAMPLING CORRECTNESS | 6 | 100% | 1% | 4 | Search SAMPLING+CORRECTNESS | Search SAMPLING+CORRECTNESS |
| 8 | INSTRUMENTATION UPGRADE | 4 | 75% | 0% | 3 | Search INSTRUMENTATION+UPGRADE | Search INSTRUMENTATION+UPGRADE |
| 9 | DATA RECTIFICATION | 4 | 44% | 1% | 7 | Search DATA+RECTIFICATION | Search DATA+RECTIFICATION |
| 10 | FLOWSHEET MASS BALANCE | 3 | 100% | 0% | 3 | Search FLOWSHEET+MASS+BALANCE | Search FLOWSHEET+MASS+BALANCE |
Key Words Plus |
| Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
|---|---|---|---|---|---|
| 1 | GROSS ERROR DETECTION | 81 | 75% | 9% | 58 |
| 2 | MATRIX PROJECTION | 79 | 85% | 7% | 41 |
| 3 | PROCESS FLOW RATES | 68 | 84% | 6% | 37 |
| 4 | DATA RECONCILIATION | 68 | 53% | 14% | 89 |
| 5 | CONSTRAINED DATA | 27 | 92% | 2% | 11 |
| 6 | GROSS ERROR IDENTIFICATION | 24 | 91% | 2% | 10 |
| 7 | MINERAL PROCESSING DATA | 17 | 100% | 1% | 8 |
| 8 | ROBUST DATA RECONCILIATION | 17 | 100% | 1% | 8 |
| 9 | REDUNDANCY CLASSIFICATION | 15 | 77% | 2% | 10 |
| 10 | SENSOR NETWORK DESIGN | 11 | 65% | 2% | 11 |
Journals |
Reviews |
| Title | Publ. year | Cit. | Active references |
% act. ref. to same field |
|---|---|---|---|---|
| Dynamic data reconciliation in mineral and metallurgical plants | 2012 | 4 | 34 | 79% |
| Design of instrumentation in process plants using Groebner bases | 2008 | 0 | 8 | 88% |
| A review of techniques for instrumentation design and upgrade in process plants | 2002 | 6 | 65 | 32% |
Address terms |
| Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
|---|---|---|---|---|---|
| 1 | COMPLEJO CRIBABB | 3 | 50% | 0.8% | 5 |
| 2 | LOOP PROC OBSERVAT OPTIMIZAT | 3 | 100% | 0.5% | 3 |
| 3 | BAYTOWN CHEM PLANT | 2 | 67% | 0.3% | 2 |
| 4 | WYDZIALE ZARZADZANIA | 2 | 67% | 0.3% | 2 |
| 5 | CIENCIAS INGN COMPUTAC | 2 | 24% | 1.0% | 6 |
| 6 | LIDECC | 1 | 31% | 0.6% | 4 |
| 7 | GIDECC | 1 | 100% | 0.3% | 2 |
| 8 | WATER QUAL OURCE MANAGEMENT | 1 | 100% | 0.3% | 2 |
| 9 | CANADA MINERAL ENERGY TECHNOL | 1 | 24% | 0.6% | 4 |
| 10 | ICI PROC SYST ENGN | 1 | 27% | 0.5% | 3 |
Related classes at same level (level 1) |
| Rank | Relatedness score | Related classes |
|---|---|---|
| 1 | 0.0000183843 | MODIFIER ADAPTATION//ELECT ELE INFORMAT ENGN//REAL TIME OPTIMIZATION |
| 2 | 0.0000118678 | TENNESSEE EASTMAN PROCESS//PROCESS MONITORING//IND PROC CONTROL |
| 3 | 0.0000105793 | ORDERING ROWS//FIELD DIAKOPTICS//GENERALIZED THEVENIN THEOREM |
| 4 | 0.0000092904 | FLOTATION CIRCUITS//CIRCUIT NETWORK OPTIMIZATION//CONCENTRATION CIRCUITS |
| 5 | 0.0000076216 | NAV ENGN//RANDOM WEIGHTING ESTIMATION//MOVING HORIZON ESTIMATION |
| 6 | 0.0000070058 | DIFFUSION CONVECTION REACTION PROCESSES//DISTRIBUTED PARAMETER SYSTEM//DISTRIBUTED PROCESS SYSTEMS |
| 7 | 0.0000067054 | GRINDING CIRCUIT//OPTIMAL SETTING CONTROL//GRINDING CIRCUITS |
| 8 | 0.0000059310 | ABNORMAL SIGNALS//PLANT ALARM SYSTEM//ALARM MANAGEMENT |
| 9 | 0.0000057890 | GENERIC MODEL CONTROL//GLOBAL POLICY LEARNING//LOCAL EXPERIENCE LEARNING |
| 10 | 0.0000042505 | TEMPERATURE SCANNING//2 FURYL OXIRANE//EXTENTS OF REACTION |