Class information for: |
Basic class information |
ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
---|---|---|---|
21424 | 361 | 19.5 | 22% |
Classes in level above (level 2) |
ID, lev. above |
Publications | Label for level above |
---|---|---|
2423 | 3672 | MATHEMATICAL GEOLOGY//MULTIPLE POINT STATISTICS//TRAINING IMAGE |
Terms with highest relevance score |
Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|---|
1 | COSMO STOCHAST MINE PLANNING | Address | 11 | 52% | 4% | 15 |
2 | MINE PLANNING | Author keyword | 9 | 37% | 5% | 19 |
3 | CUTOFF GRADE | Author keyword | 8 | 70% | 2% | 7 |
4 | OPEN PIT OPTIMIZATION | Author keyword | 8 | 75% | 2% | 6 |
5 | CUT OFF GRADE | Author keyword | 8 | 52% | 3% | 11 |
6 | MINE PRODUCTION SCHEDULING | Author keyword | 8 | 100% | 1% | 5 |
7 | MINE SCHEDULING | Author keyword | 8 | 100% | 1% | 5 |
8 | OPEN PIT MINE OPTIMIZATION | Author keyword | 3 | 100% | 1% | 3 |
9 | OPEN PIT MINING | Author keyword | 3 | 17% | 5% | 17 |
10 | MAXIMUM FLOW ALGORITHM | Author keyword | 2 | 36% | 1% | 5 |
Web of Science journal categories |
Author Key Words |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | MINE PLANNING | 9 | 37% | 5% | 19 | Search MINE+PLANNING | Search MINE+PLANNING |
2 | CUTOFF GRADE | 8 | 70% | 2% | 7 | Search CUTOFF+GRADE | Search CUTOFF+GRADE |
3 | OPEN PIT OPTIMIZATION | 8 | 75% | 2% | 6 | Search OPEN+PIT+OPTIMIZATION | Search OPEN+PIT+OPTIMIZATION |
4 | CUT OFF GRADE | 8 | 52% | 3% | 11 | Search CUT+OFF+GRADE | Search CUT+OFF+GRADE |
5 | MINE PRODUCTION SCHEDULING | 8 | 100% | 1% | 5 | Search MINE+PRODUCTION+SCHEDULING | Search MINE+PRODUCTION+SCHEDULING |
6 | MINE SCHEDULING | 8 | 100% | 1% | 5 | Search MINE+SCHEDULING | Search MINE+SCHEDULING |
7 | OPEN PIT MINE OPTIMIZATION | 3 | 100% | 1% | 3 | Search OPEN+PIT+MINE+OPTIMIZATION | Search OPEN+PIT+MINE+OPTIMIZATION |
8 | OPEN PIT MINING | 3 | 17% | 5% | 17 | Search OPEN+PIT+MINING | Search OPEN+PIT+MINING |
9 | MAXIMUM FLOW ALGORITHM | 2 | 36% | 1% | 5 | Search MAXIMUM+FLOW+ALGORITHM | Search MAXIMUM+FLOW+ALGORITHM |
10 | BUILDING VULNERABILITY ASSESSMENT | 2 | 67% | 1% | 2 | Search BUILDING+VULNERABILITY+ASSESSMENT | Search BUILDING+VULNERABILITY+ASSESSMENT |
Key Words Plus |
Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | PRODUCTION SCHEDULING PROBLEM | 15 | 88% | 2% | 7 |
2 | MULTIPLE METAL DEPOSITS | 11 | 100% | 2% | 6 |
3 | OPEN PIT DESIGN | 2 | 67% | 1% | 2 |
4 | CUTOFF GRADE | 1 | 100% | 1% | 2 |
5 | CUTOFF GRADE POLICY | 1 | 100% | 1% | 2 |
6 | PIT MINING OPERATIONS | 1 | 100% | 1% | 2 |
7 | RECLAIMER | 1 | 100% | 1% | 2 |
8 | PSEUDOFLOW | 1 | 33% | 1% | 2 |
9 | ARDNAMURCHAN | 1 | 50% | 0% | 1 |
10 | PROJECT SELECTION DECISION | 1 | 50% | 0% | 1 |
Journals |
Reviews |
Title | Publ. year | Cit. | Active references |
% act. ref. to same field |
---|---|---|---|---|
A Review of Operations Research in Mine Planning | 2010 | 31 | 34 | 79% |
A review of optimal planning of level and raise spacing in inclined narrow reefs | 2010 | 0 | 3 | 100% |
A review of real-time optimization in underground mining production | 2013 | 0 | 8 | 50% |
Address terms |
Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
---|---|---|---|---|---|
1 | COSMO STOCHAST MINE PLANNING | 11 | 52% | 4.2% | 15 |
2 | MINE LECE DOO MEDVEDJA | 1 | 100% | 0.6% | 2 |
3 | WESTERN AUSTRALIA MINES | 1 | 23% | 1.4% | 5 |
4 | EBERLY BUSINESS ADM | 1 | 50% | 0.3% | 1 |
5 | MIN OPTIMIZAT | 1 | 50% | 0.3% | 1 |
6 | OPERAT MP 2 | 1 | 50% | 0.3% | 1 |
7 | PROD INFORMAT SYST MFG | 1 | 50% | 0.3% | 1 |
8 | SISHEN IRON ORE MINE | 1 | 50% | 0.3% | 1 |
9 | PL STUDIES CIVIL ENGN GEODESY | 1 | 29% | 0.6% | 2 |
10 | OPENCAST MIN | 0 | 33% | 0.3% | 1 |
Related classes at same level (level 1) |
Rank | Relatedness score | Related classes |
---|---|---|
1 | 0.0000285101 | BIAS TESTING//MIN GEOL GRP//EXPLORATION AND MINING GEOLOGY |
2 | 0.0000083869 | MULTIPLE POINT STATISTICS//TRAINING IMAGE//MATHEMATICAL GEOLOGY |
3 | 0.0000083311 | DISCRETE DECISION PROCESS//ECON ENGN//MULTIOBJECTIVE DYNAMIC PROGRAMMING |
4 | 0.0000079192 | CUMULATIVE SEMIVARIOGRAM//POINT CUMULATIVE SEMIVARIOGRAM//ATMOSPHER ENVIRONM GRP |
5 | 0.0000066623 | GOSPODARKA SUROWCAMI MINERALNYMI-MINERAL RESOURCES MANAGEMENT//DRILLING OIL GAS//ODDZIAL KARPACKI |
6 | 0.0000061664 | GRINDING CIRCUIT//OPTIMAL SETTING CONTROL//GRINDING CIRCUITS |
7 | 0.0000058613 | RESOURCES AND ENERGY//EXHAUSTIBLE RESOURCES//IND ECON RISK MANAGEMENT |
8 | 0.0000057276 | REAL OPTIONS//INVESTMENT UNDER UNCERTAINTY//REAL OPTION |
9 | 0.0000050087 | STEINER RATIO//INVERSE FERMAT TORRICELLI PROBLEM//STEINER MINIMAL TREE |
10 | 0.0000050057 | FLOTATION CIRCUITS//CIRCUIT NETWORK OPTIMIZATION//CONCENTRATION CIRCUITS |