Class information for: |
Basic class information |
| ID | Publications | Average number of references |
Avg. shr. active ref. in WoS |
|---|---|---|---|
| 6817 | 1364 | 23.1 | 39% |
Classes in level above (level 2) |
| ID, lev. above |
Publications | Label for level above |
|---|---|---|
| 219 | 20017 | QUEUEING SYSTEMS//PERFORMANCE EVALUATION//HEAVY TRAFFIC |
Terms with highest relevance score |
| Rank | Term | Type of term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
|---|---|---|---|---|---|---|
| 1 | PRODUCTION LINES | Author keyword | 25 | 51% | 3% | 36 |
| 2 | BUFFER ALLOCATION | Author keyword | 23 | 46% | 3% | 38 |
| 3 | UNRELIABLE MACHINES | Author keyword | 23 | 76% | 1% | 16 |
| 4 | FINITE BUFFERS | Author keyword | 11 | 37% | 2% | 24 |
| 5 | TANDEM QUEUE | Author keyword | 11 | 36% | 2% | 24 |
| 6 | BUFFER ALLOCATION PROBLEM | Author keyword | 11 | 78% | 1% | 7 |
| 7 | TANDEM QUEUES | Author keyword | 9 | 31% | 2% | 26 |
| 8 | ECON STRATEGY ORG | Address | 9 | 83% | 0% | 5 |
| 9 | OPERATION DEPENDENT FAILURES | Author keyword | 8 | 75% | 0% | 6 |
| 10 | BLOCKING PHENOMENON | Author keyword | 6 | 80% | 0% | 4 |
Web of Science journal categories |
Author Key Words |
| Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
LCSH search | Wikipedia search |
|---|---|---|---|---|---|---|---|
| 1 | PRODUCTION LINES | 25 | 51% | 3% | 36 | Search PRODUCTION+LINES | Search PRODUCTION+LINES |
| 2 | BUFFER ALLOCATION | 23 | 46% | 3% | 38 | Search BUFFER+ALLOCATION | Search BUFFER+ALLOCATION |
| 3 | UNRELIABLE MACHINES | 23 | 76% | 1% | 16 | Search UNRELIABLE+MACHINES | Search UNRELIABLE+MACHINES |
| 4 | FINITE BUFFERS | 11 | 37% | 2% | 24 | Search FINITE+BUFFERS | Search FINITE+BUFFERS |
| 5 | TANDEM QUEUE | 11 | 36% | 2% | 24 | Search TANDEM+QUEUE | Search TANDEM+QUEUE |
| 6 | BUFFER ALLOCATION PROBLEM | 11 | 78% | 1% | 7 | Search BUFFER+ALLOCATION+PROBLEM | Search BUFFER+ALLOCATION+PROBLEM |
| 7 | TANDEM QUEUES | 9 | 31% | 2% | 26 | Search TANDEM+QUEUES | Search TANDEM+QUEUES |
| 8 | OPERATION DEPENDENT FAILURES | 8 | 75% | 0% | 6 | Search OPERATION+DEPENDENT+FAILURES | Search OPERATION+DEPENDENT+FAILURES |
| 9 | BLOCKING PHENOMENON | 6 | 80% | 0% | 4 | Search BLOCKING+PHENOMENON | Search BLOCKING+PHENOMENON |
| 10 | IMPROVABILITY | 6 | 71% | 0% | 5 | Search IMPROVABILITY | Search IMPROVABILITY |
Key Words Plus |
| Rank | Web of Science journal category | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
|---|---|---|---|---|---|
| 1 | FINITE BUFFERS | 114 | 67% | 8% | 103 |
| 2 | UNRELIABLE MACHINES | 100 | 67% | 7% | 90 |
| 3 | SERIAL PRODUCTION LINES | 96 | 69% | 6% | 83 |
| 4 | AUTOMATIC TRANSFER LINES | 69 | 96% | 2% | 22 |
| 5 | RELIABLE PRODUCTION LINES | 50 | 86% | 2% | 25 |
| 6 | STORAGE SPACE | 35 | 59% | 3% | 40 |
| 7 | UNRELIABLE PRODUCTION LINES | 34 | 93% | 1% | 13 |
| 8 | OPERATION TIMES | 31 | 92% | 1% | 12 |
| 9 | TRANSFER LINES | 29 | 72% | 2% | 23 |
| 10 | APPROXIMATE EVALUATION | 27 | 72% | 2% | 21 |
Journals |
Reviews |
| Title | Publ. year | Cit. | Active references | % act. ref. to same field |
|---|---|---|---|---|
| The state of the art on buffer allocation problem: a comprehensive survey | 2014 | 4 | 74 | 85% |
| Throughput analysis of production systems: recent advances and future topics | 2009 | 48 | 106 | 77% |
| Queueing theory in manufacturing systems analysis and design: A classification of models for production and transfer lines | 1996 | 106 | 114 | 76% |
| Queueing theory in manufacturing: A survey | 1999 | 46 | 155 | 45% |
| Unbalanced lines: where are we now? | 2015 | 0 | 65 | 71% |
| MULTISTAGE PRODUCTION INVENTORY SYSTEMS | 1990 | 22 | 36 | 33% |
| Waiting line model applications in manufacturing | 1998 | 10 | 104 | 29% |
| QUEUING-NETWORKS - A SURVEY OF THEIR RANDOM-PROCESSES | 1985 | 62 | 57 | 25% |
| Designing production systems for quality: research opportunities from an automotive industry perspective | 2003 | 50 | 105 | 5% |
Address terms |
| Rank | Address term | Relevance score (tfidf) |
Class's shr. of term's tot. occurrences |
Shr. of publ. in class containing term |
Num. of publ. in class |
|---|---|---|---|---|---|
| 1 | ECON STRATEGY ORG | 9 | 83% | 0.4% | 5 |
| 2 | MFG SYST | 5 | 14% | 2.6% | 36 |
| 3 | LMSSDT | 3 | 60% | 0.2% | 3 |
| 4 | OPERAT PLANNING ACCOUNTING CONTROL | 3 | 60% | 0.2% | 3 |
| 5 | DIRECTORATE GEN SAFETY INSPECT IND PROD | 2 | 67% | 0.1% | 2 |
| 6 | GEN MOTORS RD PLANNING | 2 | 67% | 0.1% | 2 |
| 7 | FINANCE OPERAT | 2 | 50% | 0.2% | 3 |
| 8 | MFG PRODUCT | 1 | 50% | 0.1% | 2 |
| 9 | URA 818 | 1 | 100% | 0.1% | 2 |
| 10 | PONSIBLE MFG | 1 | 16% | 0.5% | 7 |
Related classes at same level (level 1) |
| Rank | Relatedness score | Related classes |
|---|---|---|
| 1 | 0.0000187675 | FORK JOIN QUEUES//CLOSED QUEUING NETWORKS//PRODUCT FORM NETWORKS |
| 2 | 0.0000157815 | KANBAN//CONWIP//JUST IN TIME |
| 3 | 0.0000112630 | REGENERATIVE FLOW//ABSORBING PROCESS//CHAIR PROBABIL THEORY |
| 4 | 0.0000111742 | SMACS GRP//MATRIX EXPONENTIAL DISTRIBUTION//MATRIX ANALYTIC METHODS |
| 5 | 0.0000101910 | RETRIAL QUEUE//RETRIAL QUEUES//STOCHASTIC DECOMPOSITION |
| 6 | 0.0000096666 | THEORY OF CONSTRAINTS//DRUM BUFFER ROPE//THEORY OF CONSTRAINTS TOC |
| 7 | 0.0000095103 | FLEXIBLE MANUFACTURING SYSTEMS//TOOL SWITCHING//FLEXIBLE MANUFACTURING SYSTEM |
| 8 | 0.0000094618 | PROD SYST DESIGN CONTROL//HEDGING POINT POLICY//AUTOMATED PROD ENGN |
| 9 | 0.0000087407 | CONTROL MFG SYST//PIEZOELECTRIC SWITCHING//INTELLIGENT MFG SYST IMS |
| 10 | 0.0000082682 | DISCRIMINATORY PROCESSOR SHARING//PROCESSOR SHARING//PERMANENT CUSTOMERS |