Class information for: |
Basic class information |
Class id | #P | Avg. number of references |
Database coverage of references |
---|---|---|---|
326 | 18157 | 25.8 | 54% |
Hierarchy of classes |
The table includes all classes above and classes immediately below the current class. |
Terms with highest relevance score |
rank | Term | termType | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|---|
1 | SCHEDULING | authKW | 1763748 | 17% | 34% | 3123 |
2 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | journal | 1428302 | 15% | 32% | 2667 |
3 | OPERATIONS RESEARCH & MANAGEMENT SCIENCE | WoSSC | 1178939 | 57% | 7% | 10432 |
4 | ENGINEERING, INDUSTRIAL | WoSSC | 935413 | 39% | 8% | 7112 |
5 | SINGLE MACHINE | authKW | 897970 | 3% | 95% | 564 |
6 | ENGINEERING, MANUFACTURING | WoSSC | 807557 | 36% | 7% | 6615 |
7 | FLOW SHOP | authKW | 800719 | 3% | 87% | 545 |
8 | MAKESPAN | authKW | 742891 | 3% | 73% | 606 |
9 | COMPUTERS & INDUSTRIAL ENGINEERING | journal | 445274 | 7% | 23% | 1182 |
10 | CELLULAR MANUFACTURING | authKW | 411378 | 2% | 89% | 276 |
Web of Science journal categories |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | Operations Research & Management Science | 1178939 | 57% | 7% | 10432 |
2 | Engineering, Industrial | 935413 | 39% | 8% | 7112 |
3 | Engineering, Manufacturing | 807557 | 36% | 7% | 6615 |
4 | Computer Science, Interdisciplinary Applications | 72656 | 17% | 1% | 3165 |
5 | Automation & Control Systems | 24768 | 8% | 1% | 1447 |
6 | Management | 19453 | 8% | 1% | 1362 |
7 | Computer Science, Artificial Intelligence | 11061 | 7% | 1% | 1270 |
8 | Engineering, General | 3960 | 4% | 0% | 737 |
9 | Robotics | 3553 | 1% | 1% | 247 |
10 | Computer Science, Theory & Methods | 2203 | 4% | 0% | 673 |
Address terms |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | IND ENGN | 370194 | 12% | 10% | 2247 |
2 | IND ENGN SYST MANAGEMENT | 91122 | 1% | 46% | 117 |
3 | IND ENGN MANAGEMENT | 88755 | 3% | 9% | 565 |
4 | IND MANAGEMENT | 82761 | 2% | 14% | 364 |
5 | IND SYST ENGN | 56572 | 3% | 6% | 540 |
6 | LOGIST MARITIME STUDIES | 47164 | 1% | 23% | 122 |
7 | GRP SISTEMAS OPTIMIZAC LICADA | 38724 | 0% | 82% | 28 |
8 | IND MFG SYST ENGN | 37590 | 1% | 12% | 190 |
9 | LIAONING MFG SYST LOGIST | 35280 | 0% | 62% | 34 |
10 | LOGIST | 33840 | 1% | 13% | 152 |
Journals |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
---|---|---|---|---|---|
1 | INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH | 1428302 | 15% | 32% | 2667 |
2 | COMPUTERS & INDUSTRIAL ENGINEERING | 445274 | 7% | 23% | 1182 |
3 | COMPUTERS & OPERATIONS RESEARCH | 240856 | 5% | 18% | 822 |
4 | EUROPEAN JOURNAL OF OPERATIONAL RESEARCH | 208465 | 7% | 9% | 1354 |
5 | INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS | 169717 | 4% | 14% | 743 |
6 | IIE TRANSACTIONS | 163301 | 3% | 20% | 500 |
7 | INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY | 138709 | 5% | 9% | 959 |
8 | JOURNAL OF SCHEDULING | 134897 | 1% | 37% | 219 |
9 | PRODUCTION PLANNING & CONTROL | 123109 | 2% | 22% | 342 |
10 | JOURNAL OF MANUFACTURING SYSTEMS | 85977 | 1% | 21% | 244 |
Author Key Words |
Rank | Term | Chi square | Shr. of publ. in class containing term |
Class's shr. of term's tot. occurrences |
#P with term in class |
LCSH search | Wikipedia search |
---|---|---|---|---|---|---|---|
1 | SCHEDULING | 1763748 | 17% | 34% | 3123 | Search SCHEDULING | Search SCHEDULING |
2 | SINGLE MACHINE | 897970 | 3% | 95% | 564 | Search SINGLE+MACHINE | Search SINGLE+MACHINE |
3 | FLOW SHOP | 800719 | 3% | 87% | 545 | Search FLOW+SHOP | Search FLOW+SHOP |
4 | MAKESPAN | 742891 | 3% | 73% | 606 | Search MAKESPAN | Search MAKESPAN |
5 | CELLULAR MANUFACTURING | 411378 | 2% | 89% | 276 | Search CELLULAR+MANUFACTURING | Search CELLULAR+MANUFACTURING |
6 | GROUP TECHNOLOGY | 379223 | 1% | 86% | 262 | Search GROUP+TECHNOLOGY | Search GROUP+TECHNOLOGY |
7 | FLOW SHOP SCHEDULING | 370643 | 1% | 90% | 245 | Search FLOW+SHOP+SCHEDULING | Search FLOW+SHOP+SCHEDULING |
8 | SINGLE MACHINE SCHEDULING | 369042 | 1% | 87% | 252 | Search SINGLE+MACHINE+SCHEDULING | Search SINGLE+MACHINE+SCHEDULING |
9 | DETERIORATING JOBS | 356116 | 1% | 100% | 213 | Search DETERIORATING+JOBS | Search DETERIORATING+JOBS |
10 | PARALLEL MACHINES | 340351 | 2% | 70% | 289 | Search PARALLEL+MACHINES | Search PARALLEL+MACHINES |
Core articles |
The table includes core articles in the class. The following variables is taken into account for the relevance score of an article in a cluster c: (1) Number of references referring to publications in the class. (2) Share of total number of active references referring to publications in the class. (3) Age of the article. New articles get higher score than old articles. (4) Citation rate, normalized to year. |
Rank | Reference | # ref. in cl. |
Shr. of ref. in cl. |
Citations |
---|---|---|---|---|
1 | ALLAHVERDI, A , (2015) THE THIRD COMPREHENSIVE SURVEY ON SCHEDULING PROBLEMS WITH SETUP TIMES/COSTS.EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. VOL. 246. ISSUE 2. P. 345 -378 | 336 | 95% | 11 |
2 | ALLAHVERDI, A , NG, CT , CHENG, TCE , KOVALYOV, MY , (2008) A SURVEY OF SCHEDULING PROBLEMS WITH SETUP TIMES OR COSTS.EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. VOL. 187. ISSUE 3. P. 985 -1032 | 222 | 92% | 451 |
3 | BATTAIA, O , DOLGUI, A , (2013) A TAXONOMY OF LINE BALANCING PROBLEMS AND THEIR SOLUTION APPROACHES.INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS. VOL. 142. ISSUE 2. P. 259 -277 | 215 | 92% | 88 |
4 | RUIZ, R , VAZQUEZ-RODRIGUEZ, JA , (2010) THE HYBRID FLOW SHOP SCHEDULING PROBLEM.EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. VOL. 205. ISSUE 1. P. 1 -18 | 181 | 95% | 180 |
5 | ALLAHVERDI, A , (2016) A SURVEY OF SCHEDULING PROBLEMS WITH NO-WAIT IN PROCESS.EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. VOL. 255. ISSUE 3. P. 665 -686 | 178 | 96% | 0 |
6 | NEUFELD, JS , GUPTA, JND , BUSCHER, U , (2016) A COMPREHENSIVE REVIEW OF FLOWSHOP GROUP SCHEDULING LITERATURE.COMPUTERS & OPERATIONS RESEARCH. VOL. 70. ISSUE . P. 56 -74 | 129 | 98% | 2 |
7 | CHAUDHRY, IA , KHAN, AA , (2016) A RESEARCH SURVEY: REVIEW OF FLEXIBLE JOB SHOP SCHEDULING TECHNIQUES.INTERNATIONAL TRANSACTIONS IN OPERATIONAL RESEARCH. VOL. 23. ISSUE 3. P. 551 -591 | 128 | 91% | 3 |
8 | RIBAS, I , LEISTEN, R , FRAMINAN, JM , (2010) REVIEW AND CLASSIFICATION OF HYBRID FLOW SHOP SCHEDULING PROBLEMS FROM A PRODUCTION SYSTEM AND A SOLUTIONS PROCEDURE PERSPECTIVE.COMPUTERS & OPERATIONS RESEARCH. VOL. 37. ISSUE 8. P. 1439-1454 | 130 | 94% | 116 |
9 | ROODBERGEN, KJ , VIS, IFA , (2009) A SURVEY OF LITERATURE ON AUTOMATED STORAGE AND RETRIEVAL SYSTEMS.EUROPEAN JOURNAL OF OPERATIONAL RESEARCH. VOL. 194. ISSUE 2. P. 343-362 | 127 | 96% | 109 |
10 | CHATTOPADHYAY, M , SENGUPTA, S , GHOSH, T , DAN, PK , MAZUMDAR, S , (2013) NEURO-GENETIC IMPACT ON CELL FORMATION METHODS OF CELLULAR MANUFACTURING SYSTEM DESIGN: A QUANTITATIVE REVIEW AND ANALYSIS.COMPUTERS & INDUSTRIAL ENGINEERING. VOL. 64. ISSUE 1. P. 256 -272 | 132 | 96% | 5 |
Classes with closest relation at Level 2 |