Class information for:
Level 1: ECONOMIC LOT SCHEDULING PROBLEM//ELSP//ECONOMIC LOT SCHEDULING

Basic class information

Bar chart of Publication_year

Last years might be incomplete

Hierarchy of classes

The table includes all classes above and classes immediately below the current class.



Cluster id Level Cluster label #P
12 4 COMPUTER SCIENCE, THEORY & METHODS//COMPUTER SCIENCE, INFORMATION SYSTEMS//COMPUTER SCIENCE, ARTIFICIAL INTELLIGENCE 1181119
80 3       OPERATIONS RESEARCH & MANAGEMENT SCIENCE//ENGINEERING, INDUSTRIAL//EUROPEAN JOURNAL OF OPERATIONAL RESEARCH 84493
252 2             OPERATIONS RESEARCH & MANAGEMENT SCIENCE//INVENTORY//INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS 19685
21188 1                   ECONOMIC LOT SCHEDULING PROBLEM//ELSP//ECONOMIC LOT SCHEDULING 452

Terms with highest relevance score



rank Category termType chi_square shrOfCwithTerm shrOfTermInClass termInClass
1 ECONOMIC LOT SCHEDULING PROBLEM authKW 1452291 6% 77% 27
2 ELSP authKW 941299 4% 75% 18
3 ECONOMIC LOT SCHEDULING authKW 581051 2% 83% 10
4 TIME VARYING LOT SIZES APPROACH authKW 278906 1% 100% 4
5 LOT SCHEDULING authKW 244036 2% 50% 7
6 MPAE address 213529 2% 44% 7
7 COMMON CYCLE APPROACH authKW 209179 1% 100% 3
8 FLEXIBLE PRODUCTION RATE authKW 209179 1% 100% 3
9 LOT AND DELIVERY SCHEDULING authKW 209179 1% 100% 3
10 STOCHASTIC ECONOMIC LOT SCHEDULING PROBLEM authKW 209179 1% 100% 3

Web of Science journal categories



chi_square_rank Category chi_square shrOfCwithTerm shrOfTermInClass termInClass
1 Operations Research & Management Science 56680 80% 0% 360
2 Engineering, Industrial 30603 45% 0% 203
3 Engineering, Manufacturing 25226 41% 0% 186
4 Management 2182 15% 0% 70
5 Automation & Control Systems 469 7% 0% 32
6 Computer Science, Interdisciplinary Applications 226 7% 0% 30
7 Engineering, General 51 3% 0% 14
8 Computer Science, Theory & Methods 42 3% 0% 15
9 Transportation Science & Technology 15 1% 0% 4
10 Computer Science, Software Engineering 9 2% 0% 7

Address terms



chi_square_rank term chi_square shrOfCwithTerm shrOfTermInClass termInClass
1 MPAE 213529 2% 44% 7
2 IBDK 104587 1% 50% 3
3 GIPC GRP PROD QUAL 69726 0% 100% 1
4 IND SYST ENGN OPERAT PROGRAM 69726 0% 100% 1
5 OREGAN SITE MAT SERV 69726 0% 100% 1
6 ROGLE E GRP REENGN OPERAT MANAGEMENT GRP WORK 69726 0% 100% 1
7 SCI ADM RECH GEST LOGIST GRP 69726 0% 100% 1
8 SECT TRANSPORTAT STUDIES 69726 0% 100% 1
9 SERV ORIENTAT RECH COMPETIT INT INGN ENTR 69726 0% 100% 1
10 SERV ORIENTAT RECH COMPETITIVITE INT INGE 69726 0% 100% 1

Journals



chi_square_rank term chi_square shrOfCwithTerm shrOfTermInClass termInClass
1 INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH 52715 18% 1% 81
2 INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS 30106 11% 1% 49
3 IIE TRANSACTIONS 22858 6% 1% 29
4 PRODUCTION PLANNING & CONTROL 12055 4% 1% 17
5 EUROPEAN JOURNAL OF OPERATIONAL RESEARCH 11529 11% 0% 50
6 OPERATIONS RESEARCH 7307 4% 1% 19
7 NAVAL RESEARCH LOGISTICS 4860 3% 1% 12
8 AIIE TRANSACTIONS 3817 0% 3% 2
9 JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY 3598 4% 0% 16
10 MANAGEMENT SCIENCE 3167 3% 0% 15

Author Key Words



chi_square_rank term chi_square shrOfCwithTerm shrOfTermInClass termInClass LCSH search Wikipedia search
1 ECONOMIC LOT SCHEDULING PROBLEM 1452291 6% 77% 27 Search ECONOMIC+LOT+SCHEDULING+PROBLEM Search ECONOMIC+LOT+SCHEDULING+PROBLEM
2 ELSP 941299 4% 75% 18 Search ELSP Search ELSP
3 ECONOMIC LOT SCHEDULING 581051 2% 83% 10 Search ECONOMIC+LOT+SCHEDULING Search ECONOMIC+LOT+SCHEDULING
4 TIME VARYING LOT SIZES APPROACH 278906 1% 100% 4 Search TIME+VARYING+LOT+SIZES+APPROACH Search TIME+VARYING+LOT+SIZES+APPROACH
5 LOT SCHEDULING 244036 2% 50% 7 Search LOT+SCHEDULING Search LOT+SCHEDULING
6 COMMON CYCLE APPROACH 209179 1% 100% 3 Search COMMON+CYCLE+APPROACH Search COMMON+CYCLE+APPROACH
7 FLEXIBLE PRODUCTION RATE 209179 1% 100% 3 Search FLEXIBLE+PRODUCTION+RATE Search FLEXIBLE+PRODUCTION+RATE
8 LOT AND DELIVERY SCHEDULING 209179 1% 100% 3 Search LOT+AND+DELIVERY+SCHEDULING Search LOT+AND+DELIVERY+SCHEDULING
9 STOCHASTIC ECONOMIC LOT SCHEDULING PROBLEM 209179 1% 100% 3 Search STOCHASTIC+ECONOMIC+LOT+SCHEDULING+PROBLEM Search STOCHASTIC+ECONOMIC+LOT+SCHEDULING+PROBLEM
10 FACTORY PHYSICS 185935 1% 67% 4 Search FACTORY+PHYSICS Search FACTORY+PHYSICS

Core articles

The table includes core articles in the class. The following variables is taken into account for the relevance score of an article in a cluster c:
(1) Number of references referring to publications in the class.
(2) Share of total number of active references referring to publications in the class.
(3) Age of the article. New articles get higher score than old articles.
(4) Citation rate, normalized to year.

Classes with closest relation at Level 1



rank cluster_id2 link
1 6139 LOT SIZING//CAPACITATED LOT SIZING//LOT SIZING AND SCHEDULING
2 16249 INVENTORY ROUTING//INVENTORY ROUTING PROBLEM//JOINT REPLENISHMENT
3 987 INVENTORY//DETERIORATING ITEMS//EOQ
4 15087 KANBAN//CONWIP//KANBAN SYSTEM
5 25465 HIERARCHICAL PRODUCTION PLANNING//FLEXIBLE AUTOMATED WORKSHOPS//HIERARCHICAL STOCHASTIC PRODUCTION PLANNING
6 16915 WORKLOAD CONTROL//ORDER ACCEPTANCE//ORDER RELEASE
7 18119 PROD SYST DESIGN CONTROL//AUTOMATED PROD ENGN//HEDGING POINT POLICY
8 6183 PRODUCTION LINES//BUFFER ALLOCATION//UNRELIABLE MACHINES
9 12768 WAFER FABRICATION//IND ENGN SYST MANAGEMENT//SEMICONDUCTOR MANUFACTURING
10 2576 SPARE PARTS//INTERMITTENT DEMAND//INVENTORY

Go to start page