Skip to main content

Simulation of rail traffic - Methods for timetable construction, delay modeling and infrastructure evaluation

Time: Tue 2015-06-09 10.00

Location: Sal F2, Lindstedtsvägen 28, Sing Sing, KTH

Subject area: Infrastructure with specialisation in traffic and logistics

Doctoral student: Hans Sipilä

Opponent: Professor Thomas Siefer, TU Braunschweig, Tyskland

Supervisor: Professor Bo-Lennart Nelldal

Page responsible:biblioteket@kth.se
Belongs to: News & Events
Last changed: Apr 24, 2015