Correction to project assignment CD2

There are two printing errors in problem 2 of project assignment CD. The price AB Industri is willing to pay for the contract is 50 ¤/MWh (not 350 ¤/MWh), and the start-up cost of block II should be 3100 (not 31000). Moreover, the monetary unit in table 3 should be ¤ (not SEK).

A corrected version of the project assignment has now been uploaded under the heading examination in the menu to the left.