Hoppa till huvudinnehållet
Till KTH:s startsida Till KTH:s startsida

Publikationer av Anna Kadefors

Refereegranskade

Artiklar

[1]
Rosander, L. & Kadefors, A. (2023). Implementing relational contracting in a public client organization : the influence of policy clashes, resources and project autonomy. Construction Management and Economics, 41(8), 651-669.
[2]
Vigren, O., Kadefors, A. & Eriksson, K. (2022). Digitalization, innovation capabilities and absorptive capacity in the Swedish real estate ecosystem. Facilities, 40(15-16), 89-106.
[3]
Poblete, L., Kadefors, A., Rådberg, K. K. & Gluch, P. (2022). Temporality, temporariness and keystone actor capabilities in innovation ecosystems. Industrial Marketing Management, 102, 301-310.
[4]
Lingegård, S., Olsson, J. A., Kadefors, A. & Uppenberg, S. (2021). Sustainable Public Procurement in Large Infrastructure Projects—Policy Implementation for Carbon Emission Reductions. Sustainability, 13(20), 11182-11182.
[5]
Kadefors, A., Lingegård, S., Uppenberg, S., Alkan-Olsson, J. & Balian, D. (2020). Designing and implementing procurement requirements for carbon reduction in infrastructure construction–international overview and experiences. Journal of Environmental Planning and Management.
[6]
Eriksson, P.-E., Volker, L., Kadefors, A., Lingegård, S., Larsson, J. & Rosander, L. (2019). Collaborative procurement strategies for infrastructure projects : a multiple-case study. Proceedings of the Institution of Civil Engineers : Management, procurement and law, 172(5), 197-205.
[7]
Troje, D. & Kadefors, A. (2018). Employment requirements in Swedish construction procurement - institutional perspectives. Journal of Facilities Management, 16(3), 284-298.
[8]
Eriksson, T. & Kadefors, A. (2017). Organisational design and development in a large rail tunnel project - Influence of heuristics and mantras. International Journal of Project Management, 35(3), 492-503.

Konferensbidrag

[9]
Molén, J., Kadefors, A., Troje, D. (2023). Integrating Facilities Management knowledge in municipal school building : Swedish case studies. Presenterad vid CIB W070 Conference on Facility Management and Maintenance 2023, Trondheim, Norway, May 8 2023 - May 11 2023. IOP Publishing.
[10]
Molén, J., Kadefors, A., Havenvid, M. I. (2020). Integrating knowledge of building operation and use into Swedish municipal school planning. Presenterad vid ARCOM.
[11]
Rootzén, J., Karlsson, I., Johnsson, F., Kadefors, A., Uppenberg, S. (2020). Supply-chain collective action towards zero CO2 emissions in infrastructure construction : Mapping barriers and opportunities. I IOP Conference Series: Earth and Environmental Science. (s. 042064). IOP Publishing Ltd.
[12]
Rosander, L., Kadefors, A. (2019). From project to policy : Implementing a collaborative procurement strategy in a public client organization. I Proceedings of the 35th Annual ARCOM Conference: 2-4 September 2019, Leeds, UK. (s. 750-759).
[13]
Gluch, P., Kadefors, A., Kohn-Rådberg, K. (2019). Orchestrating Multi-Actor Collaborative Innovation Across Organizational Boundaries. I 10th Nordic Conference on Construction Economics and Organization, Emerald Reach Proceedings Series, Volume 2. (s. 371-379). Emerald Group Publishing Limited.
[14]
Karrbom Gustavsson, T., Kadefors, A., Lingegård, S., Laedre, O., Klakegg, O. J., Olsson, N., Larsson, J. (2019). Procurement Research: Current State and Future Challenges in the Nordic Countries. I 10th Nordic Conference on Construction Economics and Organization (Emerald Reach Proceedings Series, Volume 2). (s. 195-204). Emerald Group Publishing Limited.
[15]
Kadefors, A., Lingegård, S., Johanna, A.-O., Stefan, U., Daniel, B. (2019). Public procurement for carbon reduction in infrastructure projects : an international overview. I Proceedings SBE19 Graz Sustainable Built Environment Conference 2019: Transition towards a net zero carbon built environment. IOP Publishing.
[16]
Volker, L., Eriksson, P. E., Kadefors, A., Larsson, J. (2018). A case based comparison of the efficiency and innovation potential of integrative and collaborative procurement strategies. I Proceeding of the 34th Annual ARCOM Conference, ARCOM 2018. (s. 515-524). Association of Researchers in Construction Management (ARCOM).
[17]
Kadefors, A., Olofsson, T. (2017). University-industry collaboration and innovation in a project-based engineering context. Presenterad vid 24th Nordic Academy of Management conference, Nord University Business School, Bodø.
[18]
Petersen, D., Kadefors, A. (2016). Social procurement and employment requirements in construction. I Proceedings of the 32nd Annual ARCOM Conference, ARCOM 2016. (s. 997-1006). Association of Researchers in Construction Management.

Icke refereegranskade

Kapitel i böcker

[19]
Kadefors, A. (2018). Pratar du inköpingska eller projektledningska?. I Bröchner, J och Granberg, M (Red.), Klokare upphandling: En antologi från den Formasfinansierade satsningen ProcSIBE (s. 8-9). Karlstad: Karlstads universitet.

Rapporter

[20]
Rosander, L., Kadefors, A. & Eriksson, P.-E. (2024). Samverkan i infrastrukturprojekt : Erfarenheter av tvåfaskontrakt i Trafikverket 2015–2023 (TRITA-ABE-RPT 2331). Stockholm.
[21]
Kadefors, A., Bengtsson, S. H., Nilsson-Vestola, E. & Eriksson, P.-E. (2023). Samverkan Hög inom väg- och järnvägsunderhåll : Uppföljning av tidiga skeden i tre pilotkontrakt (TRITA-ABE-RPT 2312). Stockholm: KTH Royal Institute of Technology.
[22]
Kadefors, A., Kohn Rådberg, K., Bolminger, S. & Svantesson, E. (2022). Byggherredriven innovation : en guide till förbättrad innovationsförmåga (TRITA-ABE-RPT 2034). Stockholm: Kungliga tekniska högskolan.
[23]
[25]
Kadefors, A., Olofsson, T. & Ask, M. (2019). Innovation processes and dissemination of research-based knowledge in Swedish rock engineering : Experiences in the trust geoinfra project (BeFo 183). Stockholm: Rock Engineering Research Foundation.
[26]
Kadefors, A., Uppenberg, S., Alkan-Olsson, J., Balian, D. & Lingegård, S. (2019). Procurement Requirements for Carbon Reduction in Infrastructure Construction Projects : An International Case Study (TRITA-ABE-RPT 198). Stockholm: KTH Royal Institute of Technology.

Övriga

Senaste synkning med DiVA:
2024-04-26 00:08:41