Lecture 4: Inventory analysis

Tid: Onsdag 12 november 2014 kl 10:00 - 12:00 2014-11-12T10:00:00 2014-11-12T12:00:00

Kungliga Tekniska högskolan
HT 2014

Plats: V22

Aktivitet: Föreläsning

Lärare: Anna Björklund ()

Studentgrupper: TCAEM_2, TMHIM_2

Info: Constructing a flow model and collecting data of the technical system, as defined in the goal and scope. Understanding this phase of LCA is important for you to make a detailed description of the technical system of your project, and to help you start collecting relevant data. This is necessary as background for the second project supervision meeting (PS2). Literature for L4: - Bauman and Tillman (2004) Hitch Hiker’s Guide, chapter 4 - PRé Consultants (2008) SimaPro 7 Introduction to LCA, chapter 3. - Rebitzer et al. (2004) Life cycle assessment. Part 1: Framework, goal and scope definition, inventory analysis, and applications.
Schemahandläggare skapade händelsen 8 april 2014

ändrade rättigheterna 15 maj 2014

Kan därmed läsas av alla och ändras av lärare.
Lärare Yevgeniya Arushanyan redigerade 16 oktober 2014

FöreläsningLecture 4: Inventory analysis

Constructing a flow model and collecting data of the technical system, as defined in the goal and scope. Understanding this phase of LCA is important for you to make a detailed description of the technical system of your project, and to help you start collecting relevant data. This is necessary as background for the second project supervision meeting (PS2). Literature for L4: - Bauman and Tillman (2004) Hitch Hiker’s Guide, chapter 4 - PRé Consultants (2008) SimaPro 7 Introduction to LCA, chapter 3. - Rebitzer et al. (2004) Life cycle assessment. Part 1: Framework, goal and scope definition, inventory analysis, and applications.

Schemahandläggare redigerade 23 oktober 2014

FöreläsningSeminarium

Schemahandläggare redigerade 23 oktober 2014

SeminariumProjektarbete

Project supervision 1

Schemahandläggare redigerade 23 oktober 2014

ProjektarbeteFöreläsning

Schemahandläggare redigerade 23 oktober 2014

Project supervision 1

Schemahandläggare redigerade 5 november 2014

L41V22

Schemahandläggare redigerade 10 november 2014

Schemahandläggare redigerade 11 november 2014

Hela världen får läsa.

Senast ändrad 2014-11-11 14:13

Taggar: Saknas än så länge.